|
Location
Tippecanoe County, Indiana
Client Reference
Tippecanoe County Drainage Board
Time Period
2001-2002 |
Project Description
CBBEL completed a wetland delineation and determination of regulatory
jurisdiction for proposed improvements to over 6000 feet of Berlowitz
Drain. Wetland impacts resulting from this project were quantified and
mitigation measures were incorporated into the proposed improvements. The
properties surrounding Berlowitz Drain are progressively being developed
into residential subdivisions. The wetland mitigation plan took into
consideration the future character of the watershed. The plan was designed
in coordination with the plans of the surrounding developers, minimized
the additional land required to complete the mitigation, and will provide
opportunities for future residents to interact with the site. Plants were
selected for the mitigation site with both habitat and aesthetics in mind.
Based on the delineated impacted and conceptual mitigation plan, permits
were obtained and the conceptual plan was incorporated into the final
construction plans for the Berlowitz Drain Improvements projects. |