North Washington Boulevard Combined Sewer Rehabilitation

Location
Indianapolis, Indiana

Client Reference
City of Indianapolis
Department of Capital Assest Management (DCAM)

Time Period
2000
 

Project Description

This project included the inspection of 3,125 feet of combined sewers to verify their existing condition. Inspection included development of a detailed log accompanied by videotape or still photography. Prepared a report that included a detailed description of the inspections, detailed hydraulic calculations, estimates of probable construction costs, evaluation of non-cost criteria, and recommendations for rehabilitation design for each of the designated sewer segments. Prepared construction plans and specifications including bidding documents for selected rehabilitation option(s). Worked with City and State agencies to procure government funding for the project.
 
 

Scope of Engineering & Professional Services

Computer Aided Drafting.