Location
Indianapolis, Indiana
Client Reference
City of Indianapolis
Department of Capital Assest Management (DCAM)
Time Period
2000
|
Project Description
This project included the inspection of 3,125 feet of
combined sewers to verify their existing condition. Inspection included
development of a detailed log accompanied by videotape or still
photography. Prepared a report that included a detailed description of the
inspections, detailed hydraulic calculations, estimates of probable
construction costs, evaluation of non-cost criteria, and recommendations
for rehabilitation design for each of the designated sewer segments.
Prepared construction plans and specifications including bidding documents
for selected rehabilitation option(s). Worked with City and State agencies
to procure government funding for the project.
|