Draft Report was completed in June 2010.
Changes made from Draft Report to Final Report included (1) IDNR approved hydraulics (Appendix 7), and (2) minor text edits. The overall content was not modified.
THE REPORT (Final Report, dated May 2011)
The main report of the Williams Creek Watershed Master Plan includes the following chapters:
- Chapter 1 - Introduction
- Chapter 2 - Existing Conditions
- Chapter 3 - Future Conditions
- Chapter 4 - Watershed Goals and Evaluation Criteria
- Chapter 5 - Recommendations for Improvement & Addressing Concerns
- Chapter 6 - Implementation Plan
- Chapter 7 - References
The full report can be viewed/downloaded as an Adobe PDF file, which is approximately 7 MB in size.
View/download Williams Creek Watershed Master Plan (Main Report Only).
The Appendices to the Plan are included below, and can be downloaded separately or obtained from the Hamilton County Surveyor's Office..
- Appendix 1 - Macroinvertebrate Raw Data Sheets
- Appendix 2 - Water Quality Raw Data Sheets
- Appendix 3 - QHEI Raw Data Sheets
- Appendix 4 - Williams Creeek Hydrologic Analysis (copy available from Hamilton County Surveyor's Office)
- Appendix 5 - Digital Files (available upon request)
- Appendix 6 - Selected Pages from Culvert Design Report, West 146th Street Added Travel Lanes (copy available from Hamilton County Surveyor's Office)
- Appendix 7 - Williams Creek Hydraulic Analysis
- Main Report
- Exhibits (large file ~ 29 MB)
- Appendices - (copy available from Hamilton County Surveyor's Office)
- Appendix 8 - Thomas Hussey Drain Hydraulic Analysis (copy available from Hamilton County Surveyor's Office)
- Appendix 9 - Williams Creek and Unnamed Tributary South of 106th Street, Analysis of Alternative Solutions
- Main Report
- Appendices - (copy available from Hamilton County Surveyor's Office)
Back to Christopher B. Burke Engineering, Ltd.